heat exchanger fouling factor table

Heat exchanger fouling factor table: how to read the numbers and what they cost you

A heat exchanger fouling factor table is one of the most quoted and least understood documents in thermal design. Designers copy a number out of it, add it to the overall heat transfer coefficient calculation, and move on. Years later a unit that was apparently oversized is running at its limit, or a unit that looked tight in the calculation is cycling because the surface is far larger than the duty needed. Both outcomes usually trace back to treating a tabulated fouling resistance as a physical property rather than as a design allowance with a history and a set of assumptions behind it.

The fouling factor, also called the fouling resistance, is the additional thermal resistance a designer adds to account for the layer of deposit that will build up on a surface between cleanings. It has units of area times temperature over power: square metres kelvin per watt. It is not measured on your unit, it is not a property of your fluid, and it is not a prediction. It is a commercial and engineering convention that lets a buyer and a manufacturer agree on how much margin the unit will carry.

What a fouling factor actually represents

Every heat exchanger has an overall resistance made of three parts: the convective resistance on the hot side, the conduction resistance through the wall, and the convective resistance on the cold side. Fouling adds two more terms, one on each surface, in series with the others. Because resistances in series add, a fouling term that looks small next to a gas-side convective resistance can be the dominant term next to a clean liquid-side one.

That is the first trap. A fouling resistance of 0.0002 m2K/W is trivial on a flue gas economiser where the gas film coefficient is a few tens of W/m2K, and it is decisive on a clean water-to-water unit where the film coefficient is several thousand. The same table value means two completely different things depending on where it is applied.

It is also worth being clear about what the number is not. It is not a fouling rate, it does not tell you how fast the deposit forms, and it does not tell you what the deposit is. Those are separate questions answered by the water chemistry, the velocity, the wall temperature and the operating profile.

Reading a heat exchanger fouling factor table

Published tables are organised by fluid and by service condition, not by temperature or velocity. A row for river water will usually be split into a clean case and a silty or treated case, because the deposit mechanism is different in each. Read the row description before the number: a table entry that says cooling tower water, treated, is not transferable to an untreated open circuit, and a value quoted for treated boiler feedwater does not belong on a raw water preheater.

The reputable tables come from the Tubular Exchanger Manufacturers Association, whose recommended good practice material is the reference most shell and tube specifications point to. TEMA publishes typical fouling resistances for a long list of services, and those figures have been revised between editions as operating experience accumulated. That history matters: if your contract names an edition, the number in that edition is the one that governs, not the one in a newer table you found online.

When you are at the sizing stage and want to see how a fouling allowance changes the surface you need, the sizing and selection tools will let you run the duty with and without the allowance side by side, which is usually more instructive than arguing about the number itself.

If you would rather have it sized for you, send us the fluid, the flow rate, the inlet and outlet temperatures on both sides and the heat duty, and we will come back with a sized quotation and the fouling allowance stated explicitly so you can see what it added. That is the honest way to compare two offers that quote different areas for the same duty.

Units and conversions people get wrong

Two unit systems are in circulation and they are not close enough to guess between. The SI value is square metres kelvin per watt. The imperial value, still common in older specifications and in American design practice, is hours square feet degrees Fahrenheit per British thermal unit. One hour square foot degree Fahrenheit per Btu equals roughly 0.176 square metres kelvin per watt, so an imperial figure of 0.001 converts to about 0.000176 in SI.

The classic error is a factor of a thousand: a table in millimetre-based units, or a value copied as 0.001 when the SI table said 0.000001, will produce a unit so oversized it never reaches design velocity, or so tight it cannot meet the duty on day one. Check the header row of the table before the numbers. If the values are in the range 0.0001 to 0.002, they are almost certainly SI. If they read 0.0005 to 0.01, they are probably imperial.

The second error is mixing a fouling resistance with a fouling coefficient. Some references tabulate a heat transfer coefficient for the deposit rather than a resistance. They are reciprocals, and a table of coefficients will show large numbers where a table of resistances shows small ones.

Typical values for common services

The ranges below are the order of magnitude you will find in TEMA-based design tables for the same services. They are here to calibrate your reading of a table, not to replace the one your specification calls up: confirm every figure against the edition named in your contract, and against the actual water chemistry on site.

ServiceTypical fouling resistance (m2K/W)What drives the number
Treated cooling tower water0.00017 to 0.00035Cycle of concentration, biocide programme, suspended solids
Sea water, clean0.00009 to 0.00018Velocity above about 1 m/s limits settlement; biological film still forms
River water, silty0.00018 to 0.00035Suspended silt load and seasonal flood periods
Brine0.00018Salt concentration and temperature rise across the unit
Fuel oil0.0007 to 0.0009Asphaltene and coke precursors, wall temperature
Clean organic vapour0.00009Essentially condensation only, no deposit path
Steam, clean and dry0.00009Non-condensables and carryover are the real risk, not the tabulated value
Clean organic liquid0.00009 to 0.00018Thermal stability at the wall temperature

Two entries in that table deserve a warning. Steam at 0.00009 assumes dry saturated steam with no carryover. In practice a steam heater that fouls is usually suffering from non-condensable gases or boiler water carryover, neither of which the fouling factor covers. And fuel oil at 0.0007 to 0.0009 is an allowance for a service that can coke hard enough to require mechanical cleaning; a unit designed to that allowance and then run at low velocity will still foul faster than the table predicts.

Why a bigger fouling allowance does not always mean a safer design

The instinct is that more margin is safer. In fouling terms it is often the opposite. A larger allowance means more surface, and more surface for the same duty means lower velocity in the channels and tubes. Lower velocity means less shear at the wall, which means deposit adheres more readily and stays longer. The unit is designed to tolerate a thick layer and then creates the conditions for one.

There is a second effect on control. A heavily over-surfaced unit cannot modulate down without either bypassing or cycling, and both are bad for a process that wants steady outlet temperature. The usual outcome is a unit that runs at part load, at low velocity, fouling faster than the design case it was sized for.

The practical rule is to take the tabulated allowance for the service, check that the resulting velocity sits in a sensible band, and only then decide whether to add margin. If adding margin pushes the velocity below the point where the surface stays clean, the margin is working against you.

Velocity, temperature and the fouling that follows from them

Fouling is a competition between deposition and removal. Deposition depends on concentration, temperature and residence time; removal depends on wall shear. Velocity is therefore the single most powerful variable a designer controls, and it is the one most often sacrificed to meet a pressure drop limit.

For water duties a tube-side velocity of roughly one to two metres per second is the usual working band: high enough to keep particles moving and to limit crystallisation on the wall, low enough to avoid erosion and vibration damage. Below about one metre per second, settlement and biological growth accelerate. Above about two and a half, erosion-corrosion of the inlet tube ends and of the pass partition becomes a real risk, particularly with copper alloys or with water that carries suspended solids.

Wall temperature matters as much as bulk temperature. A hot wall cooks organic material onto the surface, which is why a preheater with a high temperature difference fouls harder than the same duty run with a gentler approach. If a unit fouls only in the first few tube rows, wall temperature is usually the reason.

Cleanliness factor, and how it differs from fouling resistance

Some specifications, particularly in power generation and in older refinery practice, use a cleanliness factor instead of a fouling resistance. The cleanliness factor is the ratio of the actual overall coefficient to the clean overall coefficient, expressed as a fraction or a percentage. It is a multiplier, not an additive resistance, and the two are not interchangeable.

A cleanliness factor of 0.85 does not correspond to a specific fouling resistance unless you also know the clean coefficient. For a clean coefficient of 2000 W/m2K, a cleanliness factor of 0.85 implies an added resistance of about 0.000088 m2K/W. For a clean coefficient of 500, the same factor implies about 0.00035. That is why a specification that states only a cleanliness factor is incomplete, and why a supplier quoting an area against it can be right and still deliver the wrong unit.

Choosing the right fouling factor for a specific service

Work through four questions in order. What is the fluid and what is its deposit mechanism, biological, crystalline, particulate or chemical reaction? What is the wall temperature, because that decides which of those mechanisms is active? What velocity can the pressure drop budget support, because that decides how much of the deposit stays on the wall? And what is the cleaning interval the operator will actually keep, because that decides how much deposit the unit has to tolerate between cleans.

Only then pick the number. A unit that will be cleaned every six months does not need the allowance of one that will be cleaned every three years, and a unit with a chemical cleaning connection and a spare bundle does not need the same margin as one that has to be opened in place.

The last question is the one that gets skipped and it is the one that decides whether the design works. If the answer is that nobody will clean it, the correct engineering response is a larger allowance plus a design that can be cleaned easily, not a larger allowance alone.

What a heat exchanger fouling factor table does not tell you

It does not tell you the fouling rate, so it cannot tell you when the unit will need cleaning. It does not tell you the distribution of the deposit, which is rarely uniform: the first pass, the hot end and the low-velocity corners foul first. It does not tell you whether the deposit will be removable by chemical cleaning or will require mechanical work. And it does not tell you what happens when the process changes, which it will.

It also does not cover the fouling that comes from outside the process: cooling water treatment failures, corrosion products from upstream pipework, and debris left in the system after construction. A surprising number of first-year fouling problems are commissioning debris rather than process deposit.

Monitoring actual fouling against the design allowance

If you have specified a fouling allowance, measure against it. The cheapest method is to log the four terminal temperatures and both flow rates, calculate the overall coefficient, and compare it with the clean value from the datasheet. A trend of that coefficient over months is the only reliable evidence of how the unit is actually performing, and it converts a maintenance argument into a number.

For a shell and tube unit, the pressure drop trend is almost as useful and often easier to collect: a rising tube-side pressure drop at constant flow is a direct indicator of internal deposit. Plot both. A falling coefficient with a flat pressure drop points to shell-side fouling or to a flow distribution problem; a rising pressure drop with a stable coefficient points to tube-side deposit.

When to re-rate rather than clean

Cleaning restores the surface, but it does not change the geometry. If the measured clean coefficient after a proper clean is materially below the datasheet clean value, the unit has been permanently degraded, usually by corrosion or by erosion of the tube inlets, and cleaning will not bring it back. That is the point to re-rate the duty against the actual clean performance rather than keep cleaning and hoping.

Re-rating also applies when the duty has changed. A unit selected for one flow and temperature set will not meet a different one just because it was oversized for the first. Recalculate with the current duty and the current fouling allowance before deciding that the answer is more surface.

Putting a fouling allowance into an enquiry

State the allowance in your enquiry and state the service condition it applies to. A supplier who is told only the duty will select on a default allowance, and two suppliers using different defaults will quote different areas for the same duty, which makes the offers impossible to compare on price. Naming the fouling resistance, the velocity band you expect and the cleaning interval you can support makes the offers comparable and puts the design decision where it belongs.

If you are unsure which allowance applies to your service, describe the water or process fluid honestly, including the treatment programme and the seasonal variation, and ask for the allowance to be stated in the quotation. A supplier who will not state it is a supplier who has not thought about it. Our contact page takes the duty inputs directly, and the notes on fouling causes and prevention cover the mechanisms behind the numbers, while the plate unit cleaning methods explain what is practical to remove once a gasketed unit has fouled.