A waste heat recovery heat exchanger steel mill project usually starts with an obvious flue and ends with a unit that either corrodes through in two years or fouls solid in six months. The heat is genuinely there: a reheating furnace flue, an electric arc furnace off-gas duct, a sinter cooler exhaust and a coke oven battery all discharge gas at temperatures that would pay for themselves if they were recovered. The engineering problem is not finding the heat. It is recovering it without destroying the exchanger.
Steel mill exhaust differs from clean process gas in three ways that decide the design. It is dirty, it is often acidic, and it is intermittent. A waste heat recovery heat exchanger for a steel mill that is designed on heat duty alone will hit all three and lose on all three.
Where the heat actually is in a steel mill
The sources differ enough in temperature, dust load and chemistry that they should not be treated as one category. Each has a characteristic design response.
- Reheating furnace flue gas. Typically a few hundred degrees, moderately dirty, continuous during production. The classic economiser application: recover to preheat combustion air or feedwater.
- Electric arc furnace off-gas. Very hot, heavily dust-laden, and intermittent in a way that matters — the gas temperature and flow swing through the tap-to-tap cycle. Post-combustion control and the cooling duct arrangement dominate the design.
- Sinter cooler exhaust. Large volume, moderate temperature, abrasive dust, and a strong candidate for combustion air preheating because the air side is clean.
- Coke oven and blast furnace gas. Chemically aggressive, and the fouling is not dust but tar and condensable matter in some streams.
- Continuous casting and rolling cooling water. A liquid-side opportunity rather than a gas one, and often the cheapest to recover because the exchanger is small and the medium is clean.
The mistake at this stage is to pick the biggest flue rather than the most recoverable one. A cooler exhaust with clean-ish gas and a steady flow will often pay back faster than a hotter duct with a violent duty cycle and a dust load that needs a pre-cleaner.
Sizing a waste heat recovery heat exchanger steel mill project
Sizing starts with four numbers on the hot side and two on the cold side, and everything else is a consequence. The hot side needs mass flow, inlet temperature, outlet temperature and composition. The cold side needs the medium and its acceptable outlet temperature.
The heat duty follows from the hot side directly:
Q = m × cp × (T_in − T_out)
As an illustration of the method rather than a specification: a flue gas flow of 20,000 Nm³/h at roughly 1.29 kg/Nm³ is about 25,800 kg/h, or 7.2 kg/s. With a specific heat near 1.05 kJ/kg·K and a drop from 500 °C to 200 °C, the recoverable duty is about 2.3 MW. Change the outlet temperature to 250 °C and the duty falls by roughly a sixth, which is why the outlet temperature is a design decision and not an afterthought.
The outlet temperature is constrained from below by the acid dew point and from above by economics. The cold-side outlet is constrained by what the receiving process can accept. Between those limits sits the approach temperature, and the approach is what sets the surface area — and therefore the cost — of the whole unit.
If you want the duty checked before committing to a mechanical design, send us the fluid on each side, the flow rate, the inlet and outlet temperatures and the heat duty you expect to recover. We will come back with a sized quotation that states the approach temperature and the pressure drop it assumes.
Acid dew point: the constraint that ends most projects
Flue gas from a steel mill contains sulphur, and a fraction of the sulphur dioxide oxidises to sulphur trioxide. With water vapour present, that forms sulphuric acid, and the gas has a dew point above which the acid stays vapour and below which it condenses on the coldest surface it can find. Depending on the sulphur load and the water content, that dew point commonly lands somewhere between 120 °C and 160 °C.
Once acid condenses, the failure is not gradual. It concentrates on the cold end of the exchanger, it attacks the tube-to-tubesheet joints first, and it produces a leak path between the gas and whatever is on the other side. In a combustion air preheater that leak path puts flue gas into the burner air; in a feedwater economiser it puts water into the flue.
Three responses are available and they are usually combined.
- Keep the metal above the dew point. Raise the cold-side inlet temperature, or bypass part of the cold fluid around the exchanger at low load, so the coldest metal surface never drops below the acid dew point plus a margin.
- Use a corrosion-resistant cold end. Enamelled tubes, corrosion-resistant alloys or a non-metallic cold-end section, so that condensation can happen without immediate failure.
- Remove the sulphur upstream. Where the process allows it, this is the only response that removes the constraint rather than accommodating it.
Whichever is chosen, the design point is not the full-load case. The dangerous condition is low load, or a cold start, where the cold-side fluid enters at its lowest temperature and the gas flow is lowest. Sizing for the design case and ignoring the turndown case is how units that pass acceptance testing fail in their second winter.
Fouling, dust and the cleaning plan
A steel mill exchanger will foul. The question is whether it fouls in a way that can be cleaned online or only by stopping the plant. That is decided by the tube geometry, the gas velocity and the cleaning provision, and all three should be fixed before the thermal design is frozen.
- Finned tubes earn their area but trap dust. Spiral fins give several times the surface of a bare tube and are the right choice for clean-ish gas; in heavy dust they bridged and blind. Longitudinal fins and H-fins are more forgiving because the passages stay open.
- Gas velocity is a compromise. Fast enough to keep particles entrained, slow enough not to erode the leading tubes. Erosion scales steeply with velocity and with dust loading, and the first two rows take the punishment.
- Cleaning provision has to be designed in. Soot blowers, acoustic horns, water washing and offline access all need space, and adding them after the unit is built is usually impossible. An exchanger with no cleaning provision in a dusty duty is a maintenance liability with a heat transfer surface attached.
- Straight tubes beat bent ones for cleaning. A straight tube can be rodded; a U-tube bundle cannot.
Ask what the fouling factor in the calculation actually is, and whether it is a value the supplier has used on a comparable gas or a generic number from a textbook. The difference between a realistic and an optimistic fouling allowance is often the difference between a unit that meets its duty in year three and one that does not.
Materials and the corrosion map
Material selection follows the temperature and the condensation risk, not the average gas composition.
- Carbon steel is adequate for the hot end of a clean gas stream, provided the metal temperature stays comfortably above the dew point and the dust is not abrasive enough to erode it.
- Weathering and low-alloy steels are widely used for air preheater cold-end elements where some condensation is expected and a sacrificial corrosion allowance is acceptable.
- Austenitic stainless suits moderate temperature with wet or acidic conditions, but is not a universal answer: chlorides in the gas or in washing water can produce stress corrosion cracking in the wrong grade.
- Duplex and higher alloys are the response to chloride-bearing wet conditions, at a cost that has to be justified by the duty rather than by caution alone.
- Enamel and coatings work on the cold end of air preheaters and are a maintenance item, not a permanent solution.
One specific hazard deserves mention. In electric arc furnace off-gas, carbon monoxide can be present, and water or steam entering the gas duct is an explosion risk rather than a corrosion issue. The exchanger design and the duct layout have to be reviewed together for that reason, and a leaking tube is a safety event, not just a performance loss.
Pressure drop and the fan you did not budget for
Adding a heat exchanger to an existing duct adds resistance, and the existing fan has a fixed curve. The most common disappointment in retrofit projects is a unit that recovers the heat and cannot be run at full production because the induced draft fan cannot pull the extra draught.
Pressure drop should be treated as a hard constraint given to the thermal designer, not as an output of the design. Two configurations with the same duty can differ by a factor of two in gas-side pressure drop, and that difference is worth more than a small gain in recovered heat. Where the existing fan has no margin, the honest options are a larger face area, a parallel duct arrangement, or a fan upgrade — and the fan upgrade has to be in the payback calculation.
Thermal expansion and the mechanical layout
A steel mill exchanger lives between a hot duct that moves and a cold structure that does not. The design has to absorb that movement somewhere.
- Hot-side connections need expansion joints or sliding supports, and the exchanger needs a fixed point that is actually fixed.
- Long tube bundles grow by tens of millimetres between cold and operating condition. A rigidly anchored bundle in a rigidly anchored shell develops either cracked tubes or a lifted tubesheet.
- Support steel should be designed for the operating case, not the cold case, and for the possibility of a blocked gas path.
- Access for bundle withdrawal has to exist in the layout. A bundle that cannot be pulled cannot be cleaned or retubed, which converts a repairable failure into a replacement.
Bypass, turndown and the safety case
No waste heat recovery unit should be a single point of failure for the process it serves. A gas-side bypass with a damper allows the exchanger to be taken out for cleaning without stopping the furnace, and it also protects the unit during low-load operation when the dew point risk is highest.
The control logic matters as much as the hardware. The exchanger needs a low-temperature protection trip on the cold side, a high-temperature alarm on the hot side, and a defined behaviour for a tube leak. In an EAF off-gas system, a leak detection and isolation philosophy is part of the safety case; in a reheating furnace flue it is a maintenance nuisance that can still put a campaign at risk.
What a waste heat recovery heat exchanger steel mill enquiry needs
An enquiry that can be answered properly contains the following, and a supplier who asks for it is not being difficult.
- Gas composition, including sulphur and water, and whether the figures are measured or estimated.
- Flow rate and its variation across the cycle, with the minimum and maximum rather than the average.
- Inlet temperature range and the outlet temperature required, with the reason for it.
- Dust loading and particle character — abrasive, sticky, or both.
- Allowable gas-side pressure drop and the existing fan margin.
- Cold-side medium, flow, inlet temperature and allowable outlet temperature.
- Space available, including bundle withdrawal direction, and the support arrangement.
- Cleaning utilities available on site: steam for soot blowing, water for washing, compressed air.
A payback estimate built without those numbers is a guess. The waste heat recovery payback guide walks through how the economics change with fouling allowance and pressure drop, which are usually the two variables that decide whether a project survives review.
Where to start
Start with the gas data, then the dew point, then the pressure drop budget, and only then the thermal design. Projects that start with the heat duty and work backwards end up with a unit that recovers the heat on paper and fails on the duct.
The sizing and selection tools give a first estimate of surface area and configuration for a given duty, and the shell and tube range shows what the mechanical options look like in practice. If the duty is well defined but the configuration is not, contact the engineering team with the gas data and the layout constraints and ask for a proposed arrangement before the specification is written.