Most buyers never see inside the factory that builds their exchanger, which is a shame, because the nine steps below are where the difference between a unit that lasts twenty-five years and one that fails in six actually gets decided. None of them are exotic. All of them are visible on a drawing, a test certificate or a photograph — if you know what to ask for.
1. Design and thermal calculation
The duty arrives as eight numbers: two flow rates, two inlet and two outlet temperatures, the two fluids, and the design pressure. From those the engineer fixes the heat load, the LMTD, the correction factor for the pass arrangement, and the surface area. This is the step where a 10% error in the fouling allowance becomes a permanently undersized unit, so it is also the step worth auditing on any large order.
The output is a thermal design sheet with the U-value, the area, the pressure drops and the margin stated separately. If a supplier will not show you the U-value and the fouling resistance they assumed, you cannot compare their price with anyone else’s.
2. Mechanical design and the pressure vessel calculation
The thermal answer then has to survive the code. Shell thickness, tubesheet thickness, flange rating, nozzle reinforcement, expansion joint or fixed tubesheet decision — all of it falls out of GB/T 150, TEMA or ASME Section VIII Div. 1, depending on what the customer’s jurisdiction requires.
In China, a pressure vessel also needs the D1 or D2 manufacturing licence before it can legally be built and stamped. That licence is issued against the factory’s design, welding, inspection and quality systems, not against an individual product — which is why a supplier who “can build to ASME” but holds no licence is telling you something. See our D1/D2 certification for what each class covers.
3. Material incoming inspection
Tube, plate, shell pipe and forging arrive with mill certificates. The certificate says what the steel is; the inspection says whether the certificate is true. We check chemistry by spectrometer and dimensions on a sample basis, and the mill certificate number is transferred onto the unit’s own material traceability record so that fifteen years later a tube can be traced back to a heat number.
This is the least visible step and the one that most distinguishes a pressure vessel factory from a fabricator. If you are auditing a supplier, ask to see a traceability record for a unit built last year and follow one heat number through it.
4. Cutting, rolling and shell welding
Shell plate is cut, edge-prepared, rolled to diameter and welded longitudinally. The longitudinal seam is the highest-stress weld in the vessel, so it is welded under a qualified procedure (WPS/PQR), by a qualified welder, and inspected — typically 100% radiographic or ultrasonic on the long seam for a D1/D2 vessel.
Roundness matters more than it looks. An out-of-round shell makes baffle clearance unpredictable, which shows up later as shell-side bypass and a unit that never quite achieves its duty.
5. Tube sheet drilling and tube-to-tubesheet jointing
The tubesheet is drilled on a CNC centre, then the tubes are inserted and expanded — rolled — into the holes. Where the service demands it, the joint is also seal-welded. The quality of this joint decides whether the two fluids ever meet, so it is the joint most worth inspecting.
Three things are checked: tube hole diameter and finish, expansion depth and torque, and for welded joints a penetrant or helium leak test. A tube that is under-expanded leaks; a tube that is over-expanded relieves the residual stress that keeps the joint tight and cracks the ligament between holes. The window is narrow and it is set by procedure, not by feel.
6. Baffles, tie rods and bundle assembly
Baffles are cut and spaced to the thermal design — spacing sets the shell-side velocity and therefore the shell film coefficient. Segmental cuts are rotated to support the tubes; too much clearance and the shell fluid bypasses the bundle instead of crossing it.
Baffle-to-shell clearance and tube-to-baffle clearance are both specified, both measured, and both commonly fudged by fabricators who have not understood why they matter. A bundle with 3 mm of extra clearance can lose several percent of duty with no visible defect.
7. Hydrostatic test and non-destructive examination
The assembled unit is filled with water and pressurised, conventionally to 1.5 times the design pressure, held, and inspected for leaks at every joint. On the shell side and the tube side separately, because they are separate pressure boundaries.
Alongside the hydro test: radiography or ultrasonic on main seams, dye penetrant on weld toes and nozzle connections where specified, and a helium or halogen leak test on the tube-to-tubesheet joints for refrigerant or high-purity service. Every one of these produces a record with a date and an inspector’s signature.
Ask for the test pack. Hydrostatic certificate, NDT reports, material certificates, dimensional report, and the GA drawing as built. A supplier who cannot produce these is not a pressure vessel manufacturer in any sense that matters to an insurer or a notified body.
8. Surface preparation and finishing
Carbon steel is grit-blasted to the specified surface profile and primed and painted to the agreed system — which should be matched to the site atmosphere, not chosen from a default. A coastal installation needs a different system from an inland plant, and a chemical plant a different one again.
Stainless steel is pickled and passivated after welding. Skipping this leaves heat tint and free iron on the surface, and free iron is exactly what starts pitting in a chlorinated environment. It is a fifteen-minute step that prevents a fifteen-year problem, and it is invisible unless you look for the discolouration.
9. Assembly, documentation and packing
Final assembly, nameplate, and the documentation pack: data sheet, general arrangement drawing, material certificates, test records, welding procedure and welder qualifications, and the operating manual. Then packing suitable for the actual journey — sea freight for six weeks needs different protection from a domestic road delivery, and nozzle faces need blanking plates, not tape.
What to check on a factory audit
| Look for | Why |
|---|---|
| A pressure vessel licence covering the class being built | Without it the unit cannot be legally stamped in most jurisdictions |
| Welding procedure qualifications for each material used | Duplex and titanium are not welded with the carbon steel procedure |
| Tube expansion records, not just a visual check | The joint that fails is the one nobody measured |
| A traceability record that can be followed end to end | Distinguishes a vessel factory from a fabricator |
| Hydro test witnessed or independently certified | A self-declared test is not evidence |
| Pickling and passivation for stainless | Free iron is the most common cause of early pitting |
Where this happens here
All nine steps run under one roof in our 35,000 m² plant in Linshu County, Shandong: cutting, forming, welding, tube drilling and expanding, assembly, hydrostatic testing, surface finishing and packing. D1 and D2 pressure vessel approval, ISO 9001 and ISO 14001, and 20+ engineers across design and process. That single-roof arrangement is the reason we can put a named engineer on a project from the first email to the shipment, and the reason a drawing change does not become a two-month argument between three companies.
If you want to see the process rather than read about it, ask for the test pack on a specific unit — not a generic certificate PDF. See our shell and tube range, or what buying from a Chinese factory actually involves.
Frequently asked
What pressure is a shell and tube heat exchanger tested to? Conventionally 1.5 times the design pressure on each side separately, held long enough for a full inspection of every joint, with the result recorded. Higher factors apply for some codes and some services.
Do you weld tube-to-tubesheet joints or only expand them? Both, depending on service. Expanded-only is standard for moderate pressure and temperature; seal-welded plus expanded is used where the fluids must not mix, or where thermal cycling would work an expanded joint loose.
How long does a unit take to build? Standard shells run a few weeks from drawing approval; a first-off with new patterns or exotic material takes longer. The budgetary offer with a GA drawing lands within one working day of receiving the duty.
Can we witness the hydro test? Yes, and on larger or critical units we would encourage it. Third-party inspection by a nominated body can also be arranged.