Quality Control and Pressure Testing

Every heat exchanger that leaves our Linshu factory passes a documented inspection route before it is packed. This page sets out that route in the order it happens, the standards each stage is measured against, and the records a buyer receives with the unit. It is written for engineers who will be asked to accept the equipment, not for a brochure.

The management system behind the inspection route

Zhenggong operates a quality management system certified to ISO 9001 and an environmental management system certified to ISO 14001. The company holds D1 and D2 pressure vessel manufacturing qualifications issued under the Chinese pressure vessel regulatory regime, which govern the design, fabrication and inspection of the pressure-retaining parts of our shell and tube exchangers and pressure vessels.

The workshop runs 7S site management. That matters to a buyer for a practical reason: a clean, ordered fabrication bay is the cheapest visible proxy for whether weld procedures are actually being followed when nobody is filming.

Inspection stages, in the order they occur

Stage What is checked Record produced
1. Incoming material Heat number against the mill certificate for plate, tube, forging and bar stock; material grade and dimensional tolerance; surface condition of tube before assembly. Material certificate file per heat number, traceable to the unit
2. Cutting and forming Shell course dimensions, tube sheet hole pitch and diameter, baffle spacing and cut, groove and land dimensions. Dimensional inspection sheet at each operation
3. Welding Welder qualification against the applicable procedure; fit-up and root condition before capping; weld profile and visual inspection after each pass on pressure-retaining joints. Welder ID mapped to each seam on the unit
4. Tube bundle Tube-to-tubesheet joint integrity by expansion and, where specified, seal welding; tube protrusion; bundle squareness before insertion. Tube joint record, with any leak-off test result
5. Pressure testing Hydrostatic test of the shell side and tube side at the test pressure derived from the design pressure, held for the specified duration; where the design requires it, pneumatic testing instead. Signed test certificate stating medium, pressure, hold time and result
6. Surface preparation Shot blasting to the specified cleanliness grade before priming; dry film thickness of primer and topcoat at recorded points. Coating thickness log
7. Final assembly and nameplate Nozzle orientation against the approved drawing, gasket and bolting, nameplate data against the datasheet, insulation and cladding if in scope. Nameplate photograph and final dimensional report
8. Packing Nozzle blanking, desiccant and barrier bagging for sea freight, lifting points marked, crating against the shipping method. Packing list and loading photographs

Design codes we build to

Units are designed and fabricated to the code named in the purchase order. In practice that means GB/T 151 for shell and tube heat exchangers in the domestic Chinese market, TEMA for the mechanical detail that international buyers expect on the bundle and shell, and ASME Section VIII Div. 1 as the design basis when a project specifies it. ASME design compliance is not the same thing as an ASME Certificate of Authorisation, and we do not claim the latter: we design to the code, and where a project requires a U-stamp we say so before quoting rather than after.

What you receive with the equipment

  • Material certificates traceable to the heat numbers used on your unit
  • Hydrostatic (or pneumatic) test certificate, signed and dated
  • Final dimensional and nameplate data report
  • Weld map with welder identification for pressure-retaining seams
  • Coating thickness log, where coating is in scope
  • Operating and maintenance manual, including torque values for bolted joints
  • Packing list and loading photographs

Third-party inspection is welcome and is arranged on request — buyer’s inspector, a nominated classification society, or an independent inspection company engaged by the purchaser. We will open the unit, hold the test and provide the records at the witness point the purchase order specifies. The inspection cost is carried by the buyer; the access is not.

Where a non-conformity is found

A unit that fails hydrostatic testing is not re-tested until the cause is identified and the repair is recorded against the seam. A dimensional non-conformity outside drawing tolerance is either corrected or raised to the buyer as a concession request with the measured value attached. Neither of these is a routine event, and neither is resolved verbally.

Questions we are asked at audit stage

Can we see the quality manual before ordering?

Yes. The ISO 9001 and ISO 14001 certificates and the scope of registration are available on request, and we will send the quality manual section covering inspection and test planning to a buyer who is evaluating us as a supplier.

Do you use third-party NDT, or in-house?

Both routes are used depending on the joint and the project specification. Tell us in the enquiry which joints require radiography or ultrasonic examination and to which acceptance level, and it will be priced and scheduled as a witness point rather than discovered at dispatch.

What happens if the unit arrives damaged?

Photograph the packaging and the damage before unpacking further and send it to us within seven days of arrival. Damage that occurred in transit is a freight claim; damage that occurred before packing is ours. The loading photographs are what distinguishes the two.

Can the inspection records be in English?

Yes, and they are issued in English by default for export orders. Certificates for the Chinese market are issued in Chinese with the applicable standard cited.

To discuss an inspection requirement for a specific project, send the datasheet and the required witness points with your enquiry. We will confirm which of them we can meet before the quotation is issued.