Desalination Heat Exchanger: MED and RO Selection, Materials and Sizing

Three Conditions That Decide a Desalination Heat Exchanger

A desalination heat exchanger is not a heat exchanger with a different nameplate. It works in seawater or brine, it usually works under vacuum, and it is expected to do so for twenty to thirty years with cleaning intervals measured in months. Those three conditions — chloride, vacuum and fouling — eliminate most of the standard selection logic that works perfectly well on a chilled water circuit.

The consequence is that material choice does more to determine the life and the price of the unit than the thermal design does. A brine heater that is 8% short on area will still make water; a brine heater with the wrong tube alloy will be tube-plugged and derated within three years. This guide covers where the exchangers sit in a thermal plant, how to choose the alloy, what velocity and top brine temperature actually allow, and how to size the brine heater with a worked example.

Where the Exchangers Sit in a Plant

In a multi-effect distillation (MED) plant the heat exchangers are the process, not the auxiliary equipment:

  • Brine heater (or steam transformer). Condenses low-pressure steam or TVC motive steam against recirculating brine. The largest single unit, and the one that sets the top brine temperature.
  • Feed preheaters. Recover heat from condensing vapour in the effects to raise the incoming seawater. Usually plate or welded plate in titanium, because the duty is large, the approach is small and the space is tight.
  • Distillate cooler. Cools product water from effect temperature to storage temperature, preheating feed in the process. Often combined with the feed preheater train.
  • Vent and ejector condensers. Small, vacuum-side, and usually the first place a non-condensable leak shows up as a loss of vacuum rather than a loss of duty.
  • In an MVC plant, the preheater train does the same job with the compressor discharge as the heat source; the evaporator-condenser pair is the core exchanger.
  • In a seawater RO plant, exchangers appear as feed heaters for cold intakes, interstage heaters on high-recovery trains, and permeate conditioning units — plus the energy recovery device, which is a pressure exchanger rather than a heat exchanger and should not be confused with one.

Materials: The Decision That Sets the Life

Seawater at 60–70 °C with dissolved oxygen is aggressive to every stainless steel in the 300 series. Chloride pitting and crevice attack start in the tube-to-tubesheet crevice, which is exactly where you cannot inspect, and they progress through a 1.2 mm wall in a single season once established.

AlloyPRENSeawater suitabilityVelocity limitRelative cost
316L~25Not for seawater; fine for distillate and low-chloride brine2.0 m/s1.0
Duplex 2205~35Seawater to about 40–50 °C, clean and deaerated3.0 m/s1.6 – 1.9
Super duplex 2507~42Hot seawater, chlorinated, high chloride brine3.5 m/s2.2 – 2.6
6% Mo austenitic (254SMO, AL-6XN)43 – 45Hot seawater and brine, good weldability, no ferrite issues3.0 m/s2.4 – 3.0
Titanium Gr2n/aUnrestricted seawater and brine to 120 °C+; immune to chlorination3.5 – 4.5 m/s4 – 5
CuNi 90/10n/aClean seawater, good heat transfer, self-limiting biofouling2.0 – 2.5 m/s3 – 4

Three practical notes on that table. Titanium is not automatically the right answer on the distillate side, where 316L is cheaper and perfectly adequate. CuNi 90/10 has the best thermal conductivity of the seawater-capable alloys and resists biofouling because copper ions are toxic to marine organisms, but it is attacked by ammonia, sulphide and polluted harbour water, and it erodes above about 2.5 m/s — which is why it lost ground to titanium in new plants. And whichever alloy is chosen, the tube-to-tubesheet joint should be seal welded on the seawater side; an expanded-only joint in seawater is a crevice corrosion experiment with a known outcome.

Velocity: The Floor Matters More Than the Ceiling

In desalination the usual erosion argument for a velocity ceiling is secondary. The floor is what protects the plant. Below roughly 1.0 m/s, particulate settles, biofilm establishes, and the tubes begin to under-deposit corrode — a failure mode that looks like a material problem and is actually a hydraulics problem.

  • Seawater tubes: keep 1.2–2.0 m/s, with a design minimum of 1.0 m/s at any operating case, including part load.
  • With online sponge-ball cleaning, 1.5–2.0 m/s is needed for the balls to reach the full tube length; below that they drop out in the first pass.
  • Brine-side plate channels: 0.5–1.0 m/s is normal, but the brine is already deaerated and above ambient, so the corrosion risk shifts from oxygen to scaling.
  • Check the minimum, not the design point. A plant that turndowns to 60% flow drops to 0.7 m/s and starts fouling in the tubes that were fine at design.

Top Brine Temperature and the Scaling Ceiling

Every MED plant is thermally limited by what precipitates, not by what the steam can deliver. Three scales set the boundaries:

ScaleOnsetControl
Calcium carbonateFrom about 60–70 °C depending on concentration factor and alkalinityAntiscalant dosing, acid cleaning, keep TBT low
Magnesium hydroxideAbove about 75–80 °CStrict TBT limit; antiscalant; higher velocity
Calcium sulphate (hemihydrate)Above about 120–130 °CNanofiltration of feed to remove sulphate, or stay below the ceiling

This is why conventional MED runs a top brine temperature of 60–70 °C: it stays below the magnesium hydroxide threshold and keeps carbonate scaling manageable with a standard antiscalant. Higher-temperature designs at 100–120 °C exist and give more effects per tonne of steam, but they need sulphate removal or a much more aggressive chemical regime, and they push the brine heater into super duplex or titanium. Whatever the design point, the brine heater must be rated for the excursion case — losing antiscalant dosing for an hour should not require retubing.

Sizing the Brine Heater: A Worked Example

Take a 5,000 m³/d MED plant with a gain output ratio of 8, four effects and a top brine temperature of 66 °C.

  1. Steam flow. Distillate divided by GOR: 5,000 / 8 = 625 t/d, or 26 t/h.
  2. Duty. Latent heat at 70 °C is about 2,333 kJ/kg: 26,000 × 2,333 = 60.7 GJ/h, which is 16.9 MW.
  3. Terminal temperatures. Saturated steam at 75 °C condensing; brine in at 60 °C, out at 66 °C. ΔT1 = 15 K, ΔT2 = 9 K, LMTD = 11.8 K.
  4. Overall coefficient. Clean condensing steam to brine on titanium tubes: 2,000–2,500 W/m²·K. Use 2,200 with a fouling factor of 0.00009 m²·K/W.
  5. Area. A = 16.9 × 10⁶ / (2,200 × 11.8) = 651 m². Add 10% for fouling and part-load: about 715 m².
  6. Mechanical arrangement. Split into two shells of about 360 m² each. A single 700 m² shell would need an 8–9 m tube length that no standard tube bundle extraction route can service, and losing one shell to cleaning then costs half the plant rather than all of it.

Two checks finish the design. The steam-side pressure drop must stay low enough that the saturation temperature does not sag across the shell — a 15 kPa loss in a low-pressure steam line is several degrees and it comes straight off the LMTD. And the brine-side pressure drop must be compatible with the recirculation pump; 50–80 kPa per shell is the usual band.

Plate or Shell and Tube for Desalination

FactorGasketed or welded plateShell and tube
Approach temperature1–2 K achievable3–5 K typical
Footprint for the same duty30–50% of an S&TReference
Pressure limitPN16 gasketed, PN40 semi-weldedAny
Temperature limitGasket-limited: EPDM to about 150 °CNot limited in this application
CleaningCIP only; opening the pack is a planned jobTubes brushable, bundle extractable
Best fitFeed preheaters, distillate coolers, low-pressure clean dutiesBrine heater, high-duty, high-temperature, solids-bearing brine

Most modern MED plants are a hybrid: plate preheaters in titanium for the compact low-ΔT duties, and a shell and tube brine heater because it tolerates the temperature, the tube-side velocity and the maintenance access. That split is a good default, and it is what a supplier should propose unless the duty says otherwise.

Where Heat Exchange Pays on the RO Side

Reverse osmosis does not need heat, but it benefits from it. Membrane flux is rated at 25 °C and changes by roughly 2.5–3.5% per kelvin, so a cold seawater intake at 12 °C costs 30–40% of the design flux. Heating the feed from 12 °C to 20 °C with waste heat — from a nearby engine jacket, a refinery, or a power plant condenser — recovers most of that without adding membranes. Above about 35–40 °C the gain reverses, because membrane degradation and biofouling accelerate, so the exchanger needs a bypass and a temperature control loop rather than a fixed duty.

The exchanger for this duty is almost always a titanium plate unit with a wide gap on the seawater side, sized for an approach of 2 K or better, because a 5 K approach at a 20 °C target means a 25 °C heat source, which is often not available.

Specification Checklist

  1. Duty, flows and all four temperatures for every case, including the minimum-flow and excursion cases.
  2. Water analysis: chloride, sulphate, hardness, alkalinity, dissolved oxygen, suspended solids, and any chlorine residual.
  3. Design pressure and full vacuum, per side — vacuum is a design case on every effect-side exchanger, not an operating note.
  4. Top brine temperature and the excursion temperature the unit must survive.
  5. Allowable pressure drop per side, and the minimum velocity the design must maintain at 60% load.
  6. Material for shell, tubes, tubesheets, water boxes and gaskets, with the corrosion allowance stated.
  7. Cleaning method and interval, and whether online ball cleaning is fitted.
  8. Code and certification, plus the third-party inspection the offtaker requires.

Zhenggong fabricates D1/D2 certified pressure vessels under ISO 9001 and ISO 14001, with material certificates to EN 10204 3.1 and hydrostatic and leak test records issued with each unit — the documentation set that desalination EPCs and their insurers ask for. The stainless and duplex shell and tube range covers the brine heater and effect duties, and the application pages group the seawater and power-plant references.

For alloy guidance on the seawater side, the comparison of titanium against cupronickel for marine cooling sets out the same trade-offs from the shipboard side. When the duty is fixed, send the water analysis and the four temperatures to our engineering team and we will return a rating, a material recommendation with the chloride and velocity reasoning attached, and the certification scope in writing.