air cooled screw chiller for mine cooling

Air cooled screw chiller for mine cooling: load profile, ambient derating and the specification that survives the site

An air cooled screw chiller for mine cooling is usually bought against a single number — “we need 800 kW” — and then spends its life being asked to deliver that number at 46 °C ambient, at part load, with a dust-loaded condenser coil and a chilled water flow that is 12% below design. Every one of those conditions moves the delivered capacity away from the nameplate, and the selection either accounted for them or it did not.

This is how a mine cooling load is actually built, why air cooling is the right answer on some sites and the wrong one on others, what ambient temperature does to a packaged air cooled screw chiller, and which inputs a supplier needs before the selection means anything.

What a mine cooling load actually looks like

There is no single “mine cooling” load. There are four or five separate ones, and they behave differently.

  • Intake or bulk air cooling. Cooling the ventilation air entering the mine, usually with a chilled water coil in the airstream. This is the largest load and it follows the outside wet-bulb temperature, so it peaks in the afternoon and falls at night.
  • Spot cooling at the face. Smaller units or a chilled water circuit serving a local air cooler where the men actually work. Load is driven by machine heat and by the distance from the shaft.
  • Equipment cooling. Hydraulic power packs, crusher lube oil, electrical rooms and substations. Steady, predictable, and often the load that keeps running when the rest of the mine is idle.
  • Refuge chambers and control rooms. Small, critical and non-negotiable. These are the loads that justify redundancy, not the bulk air coil.

Two consequences follow. First, the load is not constant, so the chiller spends most of its hours at part load and the part-load behaviour matters as much as the peak capacity. Second, if any of the load is ventilation air cooled below its dew point, a large part of the duty is latent and the coil produces condensate — which means a drain, a corrosion allowance and a chilled water temperature low enough to condense. Sensible capacity and total capacity are not the same number, and a selection made on total kW can miss the sensible duty by a wide margin.

For a water-based circuit, the arithmetic is worth doing by hand before any supplier is approached: kW = litres per second × 4.19 × the temperature difference in kelvin. A 30 L/s circuit with a 6 K rise carries roughly 754 kW. If that number disagrees with the load estimate, one of the two is wrong, and it is usually the load estimate.

Why air cooled, and where it stops making sense

Air cooling removes the cooling tower, the condenser water pump, the water treatment and the makeup water supply. On a remote site that is a large simplification: one package, one electrical connection, one control panel, no plume and no water inventory to manage. In arid regions where water is the constrained resource, that is often the deciding argument rather than an engineering one.

The cost is efficiency and footprint. An air cooled condenser rejects heat to ambient air, so the condensing temperature sits above the dry-bulb temperature by the coil’s approach, which is typically 8 to 15 K on a clean coil. At 45 °C ambient that puts condensing temperature in the high fifties, the compressor lifts more, and the kW per kW of cooling rises accordingly. A water cooled machine with an evaporative tower is more efficient in the same conditions wherever water is available and affordable. Published capacity also depends on the rating condition, which is why a figure quoted without one is not comparable — the AHRI 550/590 rating standard exists precisely to fix those conditions.

Air cooling also rejects its heat into the local environment. A bank of chillers in a confined yard or against a wall recirculates its own discharge air, and the coil then sees 50 °C instead of 45 °C. Siting is part of the selection, not an afterthought: the units need unobstructed air in and out, and they need space to be cleaned.

If you are selecting a unit for a site, send us four numbers and two conditions: the fluid (water, or glycol with its concentration), the flow rate, the inlet and outlet temperatures you need, and the heat duty in kW — plus the design ambient dry-bulb temperature and the site altitude. We will come back with a sized selection and a quotation built on those figures, rather than on a nominal tonnage. The sizing tools page walks through the same inputs if you want to prepare them first.

Ambient temperature is the first number that changes the machine

A chiller’s published capacity is quoted at a reference condition, commonly 35 °C ambient air for an air cooled machine. Above that, capacity falls and power rises, and the fall is not linear. A machine selected exactly at its rated capacity for a 35 °C site is undersized on any site that reaches 45 °C, and the shortfall has to be covered by a margin decided at the specification stage rather than discovered in service.

The practical rule is to select at the design ambient, not at the rating condition, and then add a fouling and margin allowance on top. On a dusty mine site, 10 to 15% capacity margin over the calculated load is not conservative; it is what covers a coil that is three weeks away from its next wash.

Altitude matters as well, because an air cooled machine moves a volume of air and the mass flow falls as density falls. At 2,000 m the same fan delivers roughly three quarters of the mass flow it delivers at sea level, and the condenser does not reject the same duty. A site at altitude needs that stated in the enquiry, not assumed.

Screw compressor behaviour at part load

A screw compressor with slide valve capacity control modulates continuously down to a minimum, typically around a quarter to a third of full capacity. Below that it has to unload and cycle, and cycling is where efficiency and machine life are lost. A chiller selected at 900 kW to serve a load that spends the night at 150 kW will cycle for half its life unless the control strategy or the machine count is right.

Two smaller machines staged on load solve this better than one large machine with a wide turn-down claim. The first machine runs at a comfortable part load overnight, the second cuts in for the afternoon peak, and both run near their efficient band during the day. The capital cost difference is usually smaller than the operating difference over a few years.

Part-load efficiency is also where a variable-speed drive earns its place, particularly on a load that swings with ambient rather than sitting flat. It is not automatically the right choice: on a steady load, a fixed-speed machine with good staging can match it. Ask for the part-load curve at the site’s ambient profile, in kW input against kW cooling, and check it at the load points the mine actually runs.

Dust, coil fouling and the service access you have to design in

On a mine site the condenser coil is an air filter that nobody cleans often enough. Dust bridges the fin gaps, the approach temperature climbs, discharge pressure rises and capacity falls — gradually, so nobody notices until the machine cannot hold setpoint on a hot afternoon.

Design for cleaning from the start. Leave a minimum of about 1.5 m clear in front of each coil face, do not site units where the prevailing wind loads them with dust from a stockpile or a haul road, and specify coil guards or pre-filters where airborne fibre or dust is heavy. A monthly coil wash in a dusty environment is normal, not excessive, and the machine should be laid out so that wash water and dirt have somewhere to go other than the electrical panel.

Electrical enclosures on a mine site should be rated for the dust and water actually present, with cable entries from below and sealed glands. A standard IP54 panel in a dust cloud is a maintenance contract waiting to happen.

Glycol, freezing and the cold side

Chilled water at 6 to 12 °C is the usual range, and plain water is fine there. Below about 4 °C, or anywhere the circuit can be exposed to freezing — an idle surface circuit in winter, a site that shuts down for weeks — the circuit needs glycol, and glycol changes the selection.

Propylene glycol at 30% reduces heat transfer and increases viscosity, so the same duty needs more flow, more pump head and a slightly larger evaporator. A selection made for water and then filled with glycol will underperform, sometimes by enough to miss the duty at peak. State the fluid and the concentration in the enquiry and the evaporator is sized once, correctly.

Insulate the chilled water pipe properly, including the valves and strainers, and provide a drain at the low point. Condensate on an uninsulated strainer is a slipping hazard and a corrosion source, and on a mine site it is usually both.

Electrical, controls and site integration

Voltage and frequency have to be stated: 380 to 415 V at 50 Hz and 440 to 480 V at 60 Hz are different machines, and a site running on generated power may see wider voltage and frequency excursions than a grid supply. Starting current matters on a weak supply, so soft starters or drives are often specified for that reason alone.

Controls should speak something the mine’s system speaks. Modbus RTU or TCP is the common baseline, with BACnet where a building management system is involved; a dry contact for run and alarm is the minimum. Remote monitoring is worth having on a remote site because it turns a three-day fault into a same-day phone call, but it only helps if someone is looking at it.

Decide who owns the setpoints before commissioning. A chiller fighting a mine ventilation control loop for control of the same chilled water temperature will oscillate, and the fault will be reported as a chiller problem.

Surface versus underground: the certification question

Most air cooled screw chillers on a mine are installed on surface and send chilled water or glycol down the shaft, because an air cooled condenser needs a large, clean, unobstructed air supply and rejects a lot of heat — neither of which an underground environment offers easily. Surface installation also keeps the electrical equipment out of a classified area.

Where a unit must sit underground or in an area classified for flammable gas or dust, the equipment has to carry the certification that classification requires, and that is a different machine, not a different paint finish. Confirm the area classification with the mine’s ventilation and electrical engineers before the enquiry is written, because retrofitting certification is not possible and the selection changes completely.

Redundancy, staging and the load that never goes away

Decide which loads are allowed to stop. Bulk air cooling can usually tolerate an outage in a way that a refuge chamber or a control room cannot, and the redundancy should follow the consequence rather than being spread evenly.

N+1 on two machines is the common arrangement: either can carry the critical load, and both run at peak. On three or more machines, N+2 or a segmented header gives better part-load behaviour and lets one machine be serviced while the mine works. Whatever the arrangement, the controls have to stage and rotate the machines automatically, otherwise the lead machine accumulates hours and the standby machine fails from disuse — which is a real failure mode on sites where nobody rotates duty.

The design inputs that actually size the unit

InputWhy the selection needs it
Heat load, kW (and sensible/latent split if air is cooled)Sets the evaporator duty; a total-kW figure alone can understate the coil duty
Fluid and concentration (water or glycol %)Changes heat transfer, flow and pump head
Flow rate, L/s, and supply/return temperaturesFixes the evaporator approach and the number of passes
Design ambient dry bulb, °CDerates capacity above the rating condition
Site altitude, mReduces condenser mass air flow
Electrical supply, V/Hz/phase, starting limitationDetermines motor, starter or drive
Area classification and enclosure ratingDetermines whether a standard package is acceptable
Redundancy and control protocolDetermines machine count and controller

With those eight lines a supplier can produce a selection that means something. Without the ambient and the altitude, the same eight lines produce a number that is right only on the day it was quoted.

Commissioning checks that catch a wrong selection

Measure the condenser approach on the first hot day, not on a mild one: the difference between condensing temperature and ambient air temperature should match the selection, and if it is several kelvin higher the coil is restricted, the airflow is short-circuiting or the machine is not what was ordered.

Check the chilled water flow against design and the temperature difference across the evaporator at full load. A flow well below design with a large ΔT usually means a throttled valve or a bypass, and it will show up later as erratic capacity control. Record compressor current against the nameplate full-load value at the design condition, and check oil pressure and level after the first week, because the first week is when a charge or piping error shows itself.

Specification mistakes that cost a season

Sizing on a nominal tonnage instead of a calculated kW at the site’s ambient. Ignoring altitude. Selecting for water and filling with glycol. Leaving no margin for coil fouling on a dusty site. Specifying redundancy without automatic rotation. Buying a single large machine for a load that spends most of its hours at a quarter of peak. And siting the unit against a wall, where it will recirculate its own hot air for the rest of its life.

An air cooled screw chiller for mine cooling is a straightforward machine asked to work in an environment that is not. Select it at the ambient the site actually reaches, state the fluid and the altitude, leave room to clean the coil, and stage the machines so the load profile fits the turndown. That is most of the engineering, and it is all decided before the purchase order. If any of it is still open, the contact page is the place to start.